On realising the enormous scope and growth potential in the real estate in Bhubaneswar Pramila group has planed for a mega housing cum commercial project within Bhubaneswar city limits. Besides the above we expect some Works from the Govt. Of Odisha which are active consideration of Works Department & Department of Water Resources.







Works Under Execution And Executed:







Sl No. Name of Work Client Value of Contract (Rs. in Crs. ) Value of Work Actually Executed so far ( Rs. in Crs. ) Balance Value of Work in hand (Rs. in Crs.) Remarks
01 Construction of Road Work at Khondbond Expansion Project which includes Earthwork in excavation up to FGL in hard rock by drilling and blasting to required levels and grades and dressing complete in all respect as per the specifications and directions of the Engineer, Khondbond, Joda, Odisha. TATA Steel Ltd. 33.34 11.26 22.08 Work in Progress
02 Excavation in all kinds of soil or rock including moorum, slime, Stoney earth, gravels, boulders, soft to weathered rock and cutting of overburden by mechanical means etc. at up to any depth, loading ,transporting up to 1.00 KM and unloading the excavated material properly in dumping site, approved surface , dozing, levellling the materials as required including maintaining, lighting the construction haul road, dumping point etc complete as per direction of ENGINEER at In Pit Slime Dam , JEIM, Odisha. TATA Steel Ltd. 22.96 8.60 14.36 Work in Progress
03 Construction of Boundary wall Plot-2 (Lift-1) in the Project area at Kalinga Nagar in Jajpur District of Odisha. TATA Steel Ltd. 9.05 6.50 2.55 Under Execution
04 Construction of Boundary wall Plot-2 (2nd Phase) in the Project area at Kalinga Nagar in Jajpur District of Odisha. TATA Steel Ltd. 8.53 4.39 4.14 Under Execution
05 Excavation in all types of soil , leveling, loading, unloading & disposal of excavated soil at Project area in Kalinga Nagar in Jajpur District of Odisha. TATA Steel Ltd. 3.78 3.78 NIL Completed in all respect
06 Construction of Mid Station which includes GDR pathway & precast boundary wall, construction of RUB / LHS and mid station building for Vedanta Limited, Lanjigarh. Vedanta Limited. 14.26 14.26 NIL Completed in all respect
07 Construction of Mid Station which includes construction of retaining wall at manual side, new sewerage line installation, construction of concrete road from CV-104 to SR-1, drain for ball mill, switch gear & substation periphery concreting area, approach road for ash loading for Vedanta Limited, Lanjigarh Vedanta Limited. 2.36 2.23 NIL Completed in all respect
08 Construction of Retaining Wall at Mid Station building for Vedanta Limited, Lanjigarh Vedanta Limited. 2.64 2.64 NIL Completed in all respect
09 Switch gear & substation periphery concreting area, Vedanta, Lanjigarh. Vedanta Ltd. 0.86 0.86 NIL Completed in all respect
10 Construction of Concrete Road from CV - 104 to SR -1 & New Sewerage Line installation for Vedanta Ltd., Lanjigarh. Vedanta Ltd. 1.23 1.23 NIL Completed in all respect
11 Construction of Mid Station which includes GDR Pathway & precast boundary wall, construction of RUB/LHS and Mid station building for Vedanta Ltd., Lanjigarh. Vedanta Ltd. 1.15 1.15 NIL Completed in all respect
12 Construction of Creche building for Vedanta Ltd., Lanjigarh Vedanta Ltd. 0.21 0.21 NIL Completed in all respect
13 Construction of Academic block of Loyola School, Gobarghati, Kalinga Nagar, Odisha JUSCO 5.12 4.92 NIL Completed in all respect
14 Civil Works at Model School Project, Narsinghpur, Cuttack. JUSCO 3.74 3.68 NIL Completed in all respect
15 Civil Work for NOPR / KPO Township against Work Order No.: 2500006586 /107 at Kalinga Nagar in Jajpur District of Odisha JUSCO 3.15 3.15 NIL Completed
16 Civil Work for NOPR / KPO Township against Work Order No.: 2500006662 /107 at Kalinga Nagar in Jajpur District of Odisha. JUSCO 0.99 0.99 NIL Completed
17 Construction of S+3 Storied residential non multi apartment (building) over Plot No. N -3 / 118, Jaydev Vihar, BBSR. BDA 9.4 9.4 NIL Completed
18 Construction of a basement + stilt + Four Storey residential apartment building our Plot No. 259 (P), 260(P) & 269, Khata No. 213, Village - Chandrasekharpur, BBSR BDA, BBSR 14.50 12.5 2.00 Under Execution
19 Earth work in excavation and disposal at Jindal Steel & Power Ltd, Project Site, Anugul. Mistry Enterprise Ltd 2.10 2.05 NIL Completed in all respect
20 Excavation in all types of soil, loading & unloading & disposal of excavated materials and leveling at Project area stacker / re -claimer. Jindal Steel & Power Ltd. 5.28 4.85 NIL Completed in all respect
21 Site Grading work -3 x 350MW Thermal Power Plant at Kandarei village, Cuttack Dist, Orissa KVK Constructions Pvt. Ltd. 1.22 1.20 NIL Completed in all respect
22 Earth Work in formation of embankment for Railway siding for JSPL at Angul including Compaction. ARSS Infrastructu re Projects Ltd. 5.50 3.55 NIL Work stop due to rehabitation Problem & Contract Closed
23 Improvement and widening the road from Naka Gate to Kateni (IIIT to Kateni ) Bhubaneswar I.e. from4.780 Km to 8.180Km"underACA for the Year 2013- 14. Public Works Department Govt. Of Orissa 4.60 3.85 NIL Completed in all respect
24 Special Repair such as widening the road to four lane from Acharya Vihar Square to Press Chhack via Sainik School, Bhubaneswar ( Balance work) from 1/600 to 2/283 Km for the year 2014-15 Agt No. 8p1/2014-15. Public Works Department Govt. Of Orissa 3.27 3.12 NIL Completed in all respect
25 Improvement and widening the road from Janapath at Bhubaneswar such as widening the road from Rupali Sqare to Vanibihar RD 3/300 Km to 3/970Km. Public Works Department Govt. Of Orissa 3.58 3.16 NIL Completed in all respect
26 Widening of Janpath portion from Master Canteen to Ram Mandir, Bhubaneswar RD 5/600 Km to 6/550Km. Public Works Department Govt. Of Orissa 5.75 5.75 NIL Completed in all respect
27 Improvement and Widening of Road from Ekamra Square to Siripur Square with Construction of C.C. Drain Cum Footpath for the year 2014-15. Public Works Department Govt. Of Orissa 4.03 4.03 NIL Completed in all respect
28 Improvement and Widening of Road from Ekamra Square to Siripur Square with Construction of C.C. Drain Cum Footpath for the year 2014-15. Public Works Department Govt. Of Orissa 4.03 4.03 NIL Completed in all respect
29 Internal lifting & shifting of Iron Ore & Coal from specified location or Raw material yard at (RMHS / RMPP) to designated locations at our Integrated steel Plant site at Meramundali (Odisha) Bhusan Steel Ltd 2.28 2.27 NIL Completed
30 Repair & maintenance of Jaypore main cannel from RD 2.750 Km to 4.25 Km providing concrete lining and required ancillary items OCC Ltd 6.50 4.25 2.25 Under Execution
TOTAL 190.16 147.32 42.84